See how we install pellet heat in homes, apartment buildings and commercial spaces. Browse boiler replacements, copper hydronic layouts and bulk fuel storage.

2025 · Boiler and bulk storage

Bulk storage retrofit

The older Blackstar/Kedel boiler had become unreliable, so we replaced it with a 32 kW MESys AutoPellet. We kept the home’s existing hot-water distribution, installed new piping around the boiler and set up a new bulk bin with vacuum feed. The replacement was running by January 2025.

Original Blackstar pellet boiler and fabric storage bin
BeforeThe Blackstar pellet boiler from the Kedel line and its original fuel storage.
MESys AutoPellet and its fabric pellet bin with feed lines
AfterThe MESys AutoPellet, new bulk bin and vacuum feed, tied into the home’s existing heating system.

2015 · Boiler replacement

From an oil-and-wood boiler to pellets

The boiler, domestic hot water and bulk pellet storage all fit inside the existing basement. The bulkhead was the route in for the boiler.

Older oil-and-wood boiler, its flue and copper pipes in a basement
BeforeThe original boiler and piping beneath the basement stairs.
Pellet boiler and hot-water tank beneath the same basement stairs
AfterThe installed pellet boiler and domestic hot-water tank.
Green and gray pellet boiler being moved through a bulkhead stairway
InstallationGetting the boiler through the existing bulkhead.
Pellet boiler, hot-water cylinder and copper piping beside the basement stair
PipingA closer look at the water connections and the space around the boiler.

2019 · Forced-air heating

Pellet heat through ductwork

This AutoPellet Air furnace sends warm air through ductwork. The two views show the furnace face and the supply and return connections behind it.

MESys AutoPellet Air furnace next to a steel support post
FurnaceThe installed pellet furnace from the front.
Sheet-metal ducts connected to the back and side of a pellet furnace
DuctworkThe duct connections around the back of the furnace.

2026 · Venting

A chimney planned into new construction

These photos show the stainless chimney while the chase was still open. You can see the route through the framing and the connection point for the appliance.

Vertical stainless chimney within an open wood-framed chase
Chimney routeThe route through the framed chase before the walls were finished.
Stainless chimney with a branch connection inside the same open chase
Appliance connectionThe lower section where the chimney connects to the appliance vent.

2023 · Boiler replacement

A retrofit in a brick basement

In this basement, the old boiler, the new AutoPellet and the fuel bin were all photographed on site. The vacuum feed connects the separate storage bin to the boiler.

Older blue boiler and copper piping in an unfinished brick basement
BeforeThe original boiler and near-boiler piping.
New green pellet boiler at the far end of the same brick basement
AfterThe finished boiler in the basement, with space around it for service.
Fabric pellet bin and overhead hoses beside a brick wall
Fuel storageThe bulk bin and the overhead pellet-transfer hoses.

2022 · Boiler replacement

Boiler and storage in separate spaces

The new layout places the boiler by the water piping and uses another space for the bulk bin. Each has its own access for service.

Original gray boiler and exposed piping next to a basement door
BeforeThe existing boiler and its original wall piping.
MESys AutoPellet installed with copper piping and a hot-water cylinder
AfterThe new boiler and the pipes that carry heat to the building.
Fabric bulk bin visible through an open doorway
Fuel storageThe bulk bin in its own space, away from the boiler cabinet.

2025 · Hydronic heating

Boiler, bulk bin and heating zones

The wide view shows how fuel storage, the boiler and the zone piping fit together. The second view shows the space occupied by the bin itself.

Bulk pellet storage to the left of the boiler and heating-zone piping to the right
Finished systemOne room houses the fuel supply, boiler and heating zones.
Fabric pellet bin beside its fill connections
Fuel storageThe bulk bin and the connections used for delivery.

2020 · Hydronic heating

Copper piping laid out on the wall

The wall carries the piping and controls, leaving a clear aisle along the boiler, storage bin and hot-water tank.

Pellet boiler beside copper piping and green controls on a plywood wall
Piping and controlsThe pipe and control layout behind the boiler.
Fabric bulk bin, hot-water cylinder and wall-mounted pipes around an open aisle
Finished roomThe same room from the service aisle.

2019 · Boiler and bulk storage

Bulk storage in an open basement

The boiler and pellet bin share one open room. The wide view makes it easy to see the space around each piece of equipment.

Green pellet boiler and fabric bulk bin across a basement aisle
Finished roomThe boiler and pellet bin from across the room.
Green MESys AutoPellet with gray cabinet and white transfer hose
Boiler detailThe boiler cabinet and its overhead connection to the fuel supply.

2015 · Multiple boilers

Three pellet boilers in one room

Three pellet boilers face a row of bulk bins, with a central aisle to reach the equipment.

Three green pellet boilers lined up across an aisle from fabric pellet bins
Finished roomA wider look at the boilers, bins and service aisle.

2011 · Boiler replacement

Our first oil-to-pellet conversion

Our first pellet installation replaced an oil boiler with auger-fed pellet heat, a bulk bin and a new domestic hot-water tank.

Original blue oil boiler and near-boiler piping
BeforeThe original oil boiler in September 2011.
Fabric storage bin, pellet boiler and hot-water tank in the same basement
AfterThe completed system in November 2011.
Rigid auger tube connecting the fabric pellet bin to the green boiler
Fuel feedThe rigid auger carries pellets from the storage bin to the boiler.
Domestic hot-water tank with copper piping beside the pellet boiler
Hot waterThe domestic hot-water tank next to the boiler.

“The plumber and electricians were polite, courteous and cleaned up well after their work.”

Homeowner, installation recommendation

Planning your own installation?

See how we plan a MESys AutoPellet installation or tell us about your building.